Material Solutions 1 + 2 | Year 9 |
---|---|
Length | 1 Semester OR |
Pre-requisites | NIL |
Additional Costs | All students are allocated $100 towards material costs. There will be additional costs to be paid if these costs are above the $100 allocation. |
Specific Topics that will be Covered
Learning Concepts
- CAD/CAM - 3D Printing, CNC Router/Plasma and Laser Cutting
- Construction - Timber, Plastic and Metal ?
- Product design
Assessment Types
Assessment Type 1: Design Folio (50%)
Assessment Type 2: CAD/CAM and OR Practical (50%)
Top 3 Learner Behaviours
- Flexible thinking
- Driven
- Connected