Material Solutions

Year 10 - 2027

Material Solutions
1 + 2
Year 10
Length

1 Semester OR Full Year

Pre-requisitesNIL
Additional Costs

All students are allocated $100 towards material costs.  

There will be additional costs to be paid if these costs are above the $100 allocation.  

 

 

 

 

 

 

 

 

Learning Concepts

  • Construction - Timber OR Plastic OR Metal
  • Product design 

Assessment Type 1: Design Folio (50%)

  • Folio of evidence of the Design Process

Assessment Type 2: Practical Tasks (50%)

  • Practical Project (Solution)

We believe education is at the heart of a life well lived. It is a philosophy we instil in our students and one which underpins our College maxim.